While M/s. Mech Technik was established in November, 1964, as a proprietary firm, the other one i.e. M/s. Mech Technik (India) Pvt. Ltd. established subsequently in September, 1984, as a Private Limited company having duly registered with the registrar of companies from Assam and Meghalaya etc. This group of engineering firms are staffed with qualified engineers, experienced skilled personnel capable of handling all such jobs.
A few of the various works executed are named below with the name of Clients for whom the Project are undertaken :
Project: Laying/Construction of 200mm NB* 15 KM Long Lean Gas Transportation Pipeline. | ||
Client | The Chief Manager (Contracts),M/s. Oil India Limited, Pipeline Head Quarters,P.O. Udayan Vihar, GUWAHATI – 781 171 (Assam) | |
Project: Construction of Water Injection Station at Hapjan | ||
Client | The Dy. Suptg. Enginneer Production Oil (Contract),M/s. Oil India Limited, P.O. Duliajan (Pin 786 602),Dist. : DIBRGARH (Assam) | |
Project: Laying of 300mm NB 26 Long Crude Oil Pipeline from Savitri Tiniali to CTF | ||
Client | The Chief Manager (Contracts),M/s. Oil India Limited, Pipeline Head Quarters,P.O. Udayan Vihar, GUWAHATI – 781 171 (Assam) | |
Project: Procurement of 42 Nos. of 37.37 KL Rectangular Tanks | ||
Client | The Head-Materials, Materials Department,M/s. Oil India Limited, P.O. Duliajan (Pin 786 602),Dist. : DIBRGARH (Assam) | |
Project: Hydro Testing of Gas Pipelines | ||
Client | The Chief Manager (Contracts-Operations),M/s. Oil India Limited, P.O. Duliajan (Pin 786 602),Dist. : DIBRGARH (Assam) | |
Project: Construction of 03 Nos. of 500 KL Capacity Crude Oil Storage Tanks at OCS-1 | ||
Client | The Head-Contracts,M/s. Oil India Limited, P.O. Duliajan (Pin 786 602),Dist. : DIBRUGARH (Assam) | |
Project: Laying and Repair of Oil/Gas/Water Injection Pipeline in the Oil Fields of Assam & Assam Arakan Basin. | ||
Clients | The GM-HMM, ROB-II, 1st Floor,Nazira-785 685, Dist : SIVASAGAR (Assam) | |
Project: Laying/Replacement of 100 Km of 100 mm NB Welded Flow Lines. | ||
Client | The Chief Manager (Contracts),M/s. Oil India Limited, Pipeline Head Quarters,P.O. Udyan Vihar, GUWAHATI – 781 171 (Assam). | |
Project: Implementation of M.B. Lal Works Mechanical Work at Tinsukia Terminal, Assam under IOCL, NEISO | ||
Client | M/s. Indian Oil Corporation Limited,North East Integrated State Office,GUWAHATI – 781 021 (Assam) | |
Project: Cleaning of Petroleum Sludge, Repairing and Health Check-up of Crude Oil Storage Tanks of Fixed Roof Type at PS-4 | ||
Client | The Chief Manager (Contracts),M/s. Oil India Limited, Pipeline Head Quarters,P.O. Udyan Vihar, GUWAHATI – 781 171 (Assam). | |
Project: Cross-Country Oil and Gas Pipeline from 2″ dia to 24″ dia as per API Code | ||
Clients | M/s. Oil India Limited,P.O. Duliajan (Pin 786 602),Dist. : Dibrugarh (Assam) | |
M/s. Indian Oil Corporation Limited,New Delhi. | ||
M/s. Oil India Limited,P.O. Udayan Vihar, Guwahati 781 171 | ||
M/s. Assam Gas Company Limited,P.O. Duliajan (Pin 786 602),Dist. : Dibrugarh (Assam). | ||
M/s. DNP Limited,C/o. M/s. Assam Gas Company Ltd,P.O. Duliajan (Pin 786 602),
Dist. : Dibrugarh (Assam) |
||
Oil and Natural Gas Corporation LimitedNazira | ||
Project: Construction Early Production Set-up (EPS), the scope includes construction of tanks, installation of vessels, pumps etc. including all piping, mechanical, civil, electrical and instrumentation jobs. | ||
Client | M/s Oil India LimitedDuliajan | |
Project: Construction of Oil Collecting Station (O.C.S.) and Gas Compressor Station (G.C.S.) quick production setup (QPS) which include plant piping as well as equipment erection with associated civil jobs. | ||
Client | M/s. Oil India Limited,P.O. Duliajan (Pin 786 602),Dist. : Dibrugarh (Assam). | |
Project: Crude Oil and Formation Water Storage Tanks at OCS Complex as per API 650 | ||
Client | M/s. Oil India Limited,P.O. Duliajan (Pin 786 602),Dist. : Dibrugarh (Assam). | |
Project: Construction of Barrage (Steel Sluice Gates) for major Irrigation Project at River Champamati in Assam, India. | ||
Client | The Chief Engineer,Irrigation Department,Govt. of Assam,
Chandmari, Guwahati – 781003. |
|
Project: Structural work for construction of Paper Mills.a) Nowgaon Paper Millb) Cachar Paper Mill | ||
Client | Hindustan Paper Corporation Limited,Kolkata | |
Project: Underground Piping Works for CDU-VDU-DCU for Numaligarh Refinery Project, Assam | ||
Client | The Dy. General Manager (Commercial),M/s. Numaligarh Refinery Limited,Numaligarh, Dist. : Golaghat (Assam). | |
Project: Erection of Hydrocraker Reactors, one of these having near 500 M.T. single piece weight including construction of Hard Stand, Scaffolding, insertion of internals. | ||
Client | Nuovo Pignone of Italy,At Numaligarh Refinery Project Site. | |
Project: Erection, Testing and Commissioning of Pipelines, Valves, Pumps, Compressor etc. including civil works and structures for compressor / pipes support etc. for LPG (both Liquid and Vapour) Bottling Plant, Mirza, Assam. | ||
Client | M/s. Mecon Limited,Durgapur,Consultant of Indian Oil Corporation Limited,
(Marketing Division), Kolkata. |
|
Project: Fabrication and erection of structural steel work including preparation of detailed shop drawing of the Power House Building and Power House Control Room Building of the 3 x 15 MW Lakwa Thermal Power Project in Assam. | ||
Client | The Chief Engineer,Assam State Electricity Board,Guwahati, Assam. | |
Project: Design, manufacture, supply and erection of Civil Works at 1 x 30 MW C.T.P.S. extension project at Chandapur Assam. | ||
Client | The Chief Engineer,Assam State Electricity Board,Guwahti, Assam. | |
Project: Structural steel fabrication and erection of entire plant of Assam Petro-Chemical Limited, Namrup. | ||
Client | M/s. Assam Petro-Chemicals Limited,Namrup, Assam. | |
Project: Construction of Flood Light Towers (Steel Structural Work) at Bongaigaon Refinery Complex. | ||
Client | M/s. Bongaigaon Refinery & Petro-Chemicals Limited,New Delhi. | |
Project: Sewerage Treatment Plant for Guwahati Medical College, Guwahati and Consultancy of M/s. Mattur Beardshall, Mumbai. | ||
Client | M/s. National Building Construction Corporation Limited,New Delhi, Assam Unit, Guwahati. | |
Project: Underground Piping Works including associated civil works for Hydrogen and Hydrotreater Units at Indian Oil Corporation Limited, Guwahati Refinery, Noonmati, Guwahati, Assam, India. | ||
Client | M/s. Technip Italy, Spa,Delhi Project Office,Noida, India. | |
Project: Laying / Replacement of Oil / Gas / Water Injection Line etc. in Oil Field of Assam and Assam Arakan Basin. | ||
Client | M/s. Oil & Natural Gas Corporation Limited,Jorhat, Assam, India. | |
Project: Pipe Laying Construction Package # 1, Section-II for Duliajan Numaligarh Pipeline Project. | ||
Client | The DirectorM/s. DNP Ltd.Duliajan (Assam) | |
Project: Nadirkakh FIS (Construction of Head Works and other Appurtenant Works) under AIBP 2008-09 under Mangaldai Division (Irrigation) Mangaldai. | ||
Client | The Chief Engineer,Irrigation, AssamGuwahati-781003 | |
Project: Arimari FIS (Construction of Head Works and other Appurtenant Works) under AIBP 08-09 under Mangaldai Division (Irrigation) Mangaldai. | ||